Community
Space - Access Action Plan
Work
undertaken so far - following an access audit completed
by 3 Disabled People
- Created 2 Disabled
Parking Spaces - with signage
- Purchased 2 portable
hearing loops - one to one and conference loops
- Training Room
fitted with hearing loop
- Developed signage;
in Macaton and white on black as a visual aid
- Removed an inner
stud wall which reduced access
- Obtained building
quotes and developing further architects plans
- Carried out Health
and Safety audit including Internal risk assessment
- Identified Fire
alert systems at an accessible height level
- Contacted DCIL
to try to access database on funding
- Ordering of signage
at the front of building
- Purchase of reception
chair
- Decoration in
varied tones and colours to distinguish rooms and room surfaces
- Refurbishment
of Room 6 in line with access audit
- Initial costings
for Braille project
Work
programme for Access
Phase 1 (June
- Dec 2003)
- Developing a buddy
system for people who are visually and hearing impaired so
that they can be assisted in the event of fire and publicise
escape strategy in reception
- Architects drawings
for new accessible toilet, identification and obtaining of
funding and installing of new toilet.
- Architects plans
for refurbishment to simplify layout of the building
- Entrance-level
car parking area, ramp, rails and Braille sign, new weather
mat, transitional lighting
- Investigate costs
for automatically operated door
- Widening internal
doorframes and install new glass panelled doors with fittings
and door hinges to ensure full access to Community Resources
Library, training room and meeting room
- Braille internal
signage
- Development of
reception area to include induction loop
- Installing of
temporary ramps
- Consult architects
on possibility of developing 2nd floor and site lift
- Identify funding
for phase 2
Phase 2 (Jan -
June 2004)
- Obtain finance
to simplify layout of the building and widen corridor to improve
manoeuvring, and install permanent ramps and visual alarm
system
- Handrails along
internal corridors
- Widening internal
office doors
- Lobbying for improvements
in access from the Train Station
- Improve outside
lighting
- Decorate corridors
to improve visibility
- Seek planning
permission and finance to develop second floor
Phase 3 (June
- Dec 2004)
- Build 2nd floor
with lift access
This area of work
will be led by Kevin with support from Gina, Peter and Jim Seddon
and the Access Groups